Return to site

Generate Electrical SWMS with Safe Work Method Statement Template

A Safe Work Method Statement (SWMS) needs to document step by step how you are going to do a specific job. Not all jobs are the same. Are you planning to install conduits and cabling in trenches, or replace a light fitting? The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential risks and the hazard control measures are very different as well.

Electrical work is an equally critical and dangerous undertaking. Seemingly small errors have the potential to cause serious damages making it important to have rules and regulations. Any individual undertaking an electrical project has a duty and responsibility not to cause harm or affect the health of their employees, contractors, clients and other people. Electrical SWMS helps businesses fulfill this responsibility.

The Safe Work Method Statement (SWMS) is for any job that meets one of 18 activities that the Australian government considers to be “high risk”. These range from the use of explosives, through to work on or near energised electoral installations or services, work in a restricted space, and work around chemicals, gas, or flammable material.

A good Safe Work Method Statement report serves as a master document outlining the safest way to complete the task. A SWMS should be made accessible for inspection at any given time. It must also be reviewed each year and amended if required.

In NECA Generic SWMSs, the goal is to draw your attention to your responsibilities as an individual conducting a business undertaking (PCBU), you are responsible for reviewing and implementing the NECA Generic SWMS into your own safety management system.

The advantage of using NECA SWMS documents is that you get the peace of mind that the templates have been drafted by an expert. With the right Safe Work Method Statement Template, an individual can easily and quickly build a site specific SWMS. Safe Work Method Statement Template comes with professionally prepared, pre-written step by step procedures, typical hazards and appropriate safety controls.

So, assess high-risk work activities and save your valuable time generating SWMS reports with a Safe Work Method Statement Template.